What are the preparatory work before the steel structure building construction?
Steel structure building is a new type of building in modernization. The construction of steel structure buildings has been regulated by units and fields at all levels. So, what are the preparations for steel structure building before construction?
Preparatory work before construction of steel structure building:
1. The construction workers and related staff arrive at the construction site to carry out pre-installation preparations.
2. The construction workers will implement the design drawings, construction plan problems and key points to the construction team during the quality inspection before entering the site and during the construction period.
3. Carry out on-site surveys with the tenderee to safely disclose raw materials, parts and machinery and equipment, and clarify the construction plan of each process flow.
4. Undertake the installation, transportation and hoisting of steel components, positioning, calibration, tightening bolts, welding and installation, etc.
5. Check the construction process to ensure the quality of embedded parts. Design elevation, center line, geometric figure specifications, floor plans, etc. to ensure work handover procedures.
6. Prepare lifting machinery, tools, raw material plans and tools according to the requirements of the steel structure processing project. Prepare machines and auxiliary materials, cranes, DC welding machines, testing instruments, special tools and auxiliary supplies, and implement delivery standards.
7. Check and accept the axis and design elevation of steel components, and do the laying-out work of the bisection line for steel structure installation.
8. Adjust the construction plan according to the specific conditions of the construction site, carry out appropriate adjustments and fillings, and report to the project manager for approval.