How much is the cost of steel structure workshop?

For many large-scale enterprises, steel structures are often used for manufacturing when making factory building planning. In the early stage of construction, we will make a quotation after drawing planning and estimate the price per square meter of the steel structure workshop.

steel structure workshop

The cost of steel structure plant is related to the following factors

1. Area of plant

2. Structural span and cornice height

3. Crane condition

4. Enclosure system requirements

5. Labor cost

6. Transportation cost

Engineering quotation has always been a sensitive issue

In fact, for the problem of quotation, we will provide detailed and useful quotation after the planning drawings of steel structure workshop of general customers come out.

steel structure factory

In engineering practice, the price is pre evaluated by the amount of steel used per square meter

For example, a 2000 square meter steel structure workshop has no special requirements and crane beam. The steel consumption is generally about 30kg/㎡, and the estimated price is about $90/㎡. Evaluation needs to be based on specific planning schemes.

Facing different construction environment, the cost of steel structure factory will be different. At ordinary times, during construction, drawing planning will also be carried out according to different purposes of the plant, and the price will also be different.